PM Solar Rooftop Yojana 2024 Bareilly

Are you a Bareilly resident looking to harness the power of solar energy while saving on electricity bills? The PM Solar Rooftop Yojana 2024 offers an excellent opportunity to do just that.

In this guide, we’ll walk you through the application process, highlight the scheme’s benefits, and provide essential information to help you make an informed decision. Whether you’re concerned about rising energy costs or want to contribute to a greener future, this article has got you covered.

Understanding PM Solar Rooftop Yojana 2024

What is PM Solar Rooftop Yojana?

The Pradhan Mantri Solar Rooftop Yojana is a government initiative aimed at promoting solar energy adoption across India. This scheme provides financial assistance and incentives to homeowners and institutions for installing rooftop solar panels.

Benefits of the Scheme:

  • Reduced electricity bills
  • Government subsidies up to 40%
  • Contribution to clean energy production
  • Potential to earn by selling excess power to the grid
  • Long-term savings on energy costs
Prefuel energy

PM Solar Rooftop Yojana 2024: Eligibility Criteria for Bareilly Residents

The PM Solar Rooftop Yojana aims to promote the use of solar energy in residential buildings across India, including Bareilly. This initiative is a part of the larger goal to enhance renewable energy adoption and reduce reliance on conventional power sources. For residents of Bareilly considering this opportunity, understanding the eligibility criteria is essential.

Eligibility Criteria

Source Greenesa

To qualify for the PM Solar Rooftop Yojana, applicants must meet the following requirements:

Residential Buildings with a Valid Electricity Connection

Applicants must possess a valid electricity connection in their name. This ensures that the solar energy generated can be utilized effectively and that the system can be integrated with the existing grid.

Sufficient Roof Space for Solar Panel Installation

The property must have adequate roof space to accommodate solar panels. This is crucial as it determines the capacity of the solar system that can be installed, which typically ranges from 1 kW to 10 kW or more depending on space availability.

Building Ownership or NOC from the Owner

Homeowners must either own the property or secure a No Objection Certificate (NOC) from the property owner if they are tenants. This documentation is necessary to confirm that the applicant has the right to install solar panels on the premises.

Compliance with Local Building Codes and Regulations

The installation must adhere to local building codes and regulations set by municipal authorities. This includes ensuring that the structural integrity of the building can support solar installations and that all safety standards are met.

Additional Considerations

  • Income Criteria: While there are no strict income limits for receiving subsidies under this scheme, some financial institutions may require proof of income for loan applications related to solar installations, especially for systems exceeding 3 kW capacity.
  • Empanelled Vendors: It is mandatory to hire an empanelled vendor authorized to work on subsidized projects. This ensures that installations meet required specifications and standard

Step-by-Step Application Process for PM Solar Rooftop Yojana 2024

  1. Online Registration
  • Visit the official PM Solar Rooftop Yojana website
  • Create an account and fill in basic details
  1. Document Submission
  • Upload required documents (ID proof, electricity bill, etc.)
  • Provide roof area details and current power consumption
  1. Feasibility Assessment
  • A local solar vendor will assess your rooftop
  • Receive a customized solar solution proposal
  1. Approval and Subsidy Calculation
  • Wait for government approval
  • Subsidy amount will be calculated based on system capacity
  1. Installation and Grid Connection
  • Choose an empaneled vendor for installation
  • Complete the installation and grid connection process

Apply Now For Solar Rooftop Installation in Bareilly

Service Page Form

Financial Aspects and Subsidies

The financial structure of the PM Solar Rooftop Yojana includes various subsidies based on the capacity of solar installations. Below is a detailed table summarizing the key financial aspects and subsidies available under this scheme for 2024.

CapacityGeneral States SubsidySpecial Category States SubsidyTotal Maximum Subsidy
Up to 3 kW₹18,000 per kW₹20,000 per kW₹54,000
Between 3 kW and 10 kW₹18,000 for first 3 kW + ₹9,000 for each additional kW₹20,000 for first 3 kW + ₹10,000 for each additional kWUp to ₹78,000
For systems above 10 kWNot applicableNot applicableNot applicable

Transition to PM Surya Ghar Muft Bijli Yojana

As of February 13, 2024, the PM Solar Rooftop Scheme has been replaced by the PM Surya Ghar Muft Bijli Yojana. The new scheme continues to support residential solar installations but has revised subsidy structures and eligibility criteria. For applications submitted after this date:

  • A subsidy of ₹30,000 per kW is available for systems up to 2 kW.
  • For systems between 2 kW and 3 kW, an additional subsidy of ₹18,000 applies.
  • Households with systems exceeding 3 kW can receive a total subsidy capped at ₹78,000, depending on their average monthly power consumption
Prefuel energy

Conclusion

Embracing solar energy through the PM Solar Rooftop Yojana 2024 is a smart choice for Bareilly residents. Not only does it offer significant financial benefits, but it also contributes to a cleaner environment. Don’t miss out on this opportunity to reduce your carbon footprint and save on electricity bills.

Ready to start your solar journey? Contact our expert team today for a free consultation and site assessment. We’ll guide you through every step of the application process and help you make the most of the PM Solar Rooftop Yojana 2024 in Bareilly.

FAQ on PM Solar Rooftop Yojana 2024

The maximum subsidy amount available under the PM Solar Rooftop Yojana 2024 varies based on the capacity of the solar installation.

Generally, subsidies can cover a significant portion of the installation costs, potentially up to ₹7,500,000 for certain projects, depending on the specific eligibility criteria and capacity of the system installed.

The application process for the PM Solar Rooftop Yojana typically takes several weeks to a few months. This duration includes time for documentation review, site inspections, and approval processes.

However, the exact timeline may vary based on local administrative efficiency and applicant preparedness.

Yes, you can install solar panels on a rented property, but it requires permission from your landlord. It’s advisable to discuss the potential benefits with them, such as reduced energy costs and increased property value.

If permanent installation isn’t feasible, consider options like portable solar panels or participating in community solar programs

Rooftop solar systems require minimal maintenance but should be inspected regularly. Key maintenance tasks include:

  • Cleaning panels to remove dust and debris.
  • Checking for any physical damage or wear.
  • Ensuring that all electrical components are functioning properly.
    It is recommended to have a professional inspection at least once a year to ensure optimal performance

The PM Solar Rooftop Yojana 2024 offers several benefits, including:

  • Financial Incentives: Subsidies that significantly reduce installation costs.
  • Environmental Impact: Promotes renewable energy usage, reducing carbon footprints.
  • Energy Independence: Helps households generate their own electricity, leading to lower utility bills.
  • Increased Property Value: Properties with solar installations often see an increase in market value

To apply for the PM Solar Rooftop Yojana in Bareilly, follow these steps:

  1. Visit the official government website or local renewable energy office.
  2. Fill out the application form with required details.
  3. Submit necessary documents (see next question).
  4. Await site inspection and approval.

Yes, there are several incentives available under this scheme, including direct financial subsidies that can cover a substantial portion of installation costs. Additionally, participants may benefit from tax exemptions and net metering policies that allow them to earn credits for excess energy generated

As mentioned earlier, the application process can take several weeks to months depending on various factors such as documentation completeness and local processing times. It’s essential to ensure all documents are correctly submitted to avoid delays